# The Knockdown Rebuild Process: A Step-by-Step Guide

A complete step-by-step guide to the knockdown rebuild process in Australia, from feasibility to handover. Timelines, costs, and key decisions.

Before committing to a KDR, you need to confirm the project is physically and financially viable on your block. This stage involves:

Find out what your knockdown rebuild will cost

This is where timelines vary most. You will need both a demolition permit and approval for the new build. In most states you have two approval pathways:

Once you have your demolition permit, the demo contractor will:

Demolition costs for a standard single-storey home run $15,000–$30,000. See our demolition costs guide for a detailed breakdown.

## Stage 1: Feasibility Assessment (2–4 weeks)

## Stage 2: Design & Council Approvals (8–16 weeks)

## Stage 3: Demolition (2–4 weeks)

## Stage 4: Site Preparation (2–4 weeks)

## Stage 5: New Home Construction (10–14 months)

## Stage 6: Practical Completion & Handover

## Common KDR Pitfalls to Avoid

## What Does Demolition Actually Include?

## Choosing a Floorplan for Your KDR

### Fixed price vs estimated tender

## Get your KDR estimate

#### Estimate Rebuild Budget

#### Estimate Rebuild Budget

#### Estimate Rebuild Budget

#### Estimate Rebuild Budget

## Key Points

- Site assessment — check block dimensions, fall, soil conditions, easements, and any overlays (heritage, bushfire, flood). A geotechnical (soil) test costs $2,000–$4,000 and determines foundation requirements.
- Council overlays — review your local council's planning scheme for setbacks, height limits, site coverage, overlooking rules, and any heritage or neighbourhood character overlays that restrict design. See our council approvals guide for state-by-state requirements.
- Budget estimate — get a rough cost estimate for demolition + new build. Our KDR calculator gives you a starting figure based on your suburb, size, and build quality.
- Asbestos check — if the home was built before 1990, assume asbestos is present until a licensed assessor confirms otherwise. Testing costs $300–$600 and is mandatory before demolition. See our asbestos removal cost guide for full pricing.
- Complying Development Certificate (CDC) — faster (2–4 weeks), but only available if your design meets all state and council standards with no variations. Works best for standard designs on uncomplicated blocks.
- Development Application (DA) — required if your design needs any planning variations, or if the site has overlays. Takes 8–16 weeks and involves public notification and potentially a planning panel.
- Disconnect all services — electricity, gas, water, sewer, and telecommunications. Your electricity distributor (e.g., AusNet, Ausgrid, Energex) typically needs 10–15 business days' notice.
- Remove asbestos-containing materials (ACM) — this must be done by a licensed asbestos removalist before mechanical demolition begins. See our asbestos removal cost guide.
- Mechanically demolish the structure, sort materials for recycling, and remove debris to a licensed tip.
- Provide a clearance certificate confirming all hazardous materials have been removed.

## Frequently Asked Questions

### What Does Demolition Actually Include?

Demolition is more than just an excavator knocking down walls. A residential demolition involves a sequence of preparatory steps, safety requirements, and clearances — each with its own cost and timeline. Here is what a typical KDR demolition scope includes:

---
*Source: [KnockdownRebuildCost](https://kdrcost.com/guides/knockdown-rebuild-process/)*